prefab house, prefab home, integrated house, modular house
T ENGLISH
Products Category
Contact Us

Name: Mr. Alex
Tel: (0086-10) 5703 0033 (24H)
Add: No.7 TH Rd, BDA, DaXing District, Beijing, China.
E-mail: sales@steelvilla.com
Skype: steelvilla QQ:2963 466 366

News

What are included in the order?

Author:steel structure Date:2013/11/8 12:33:20

 A. Structure

1). All the materials for the steel structure.

2). All the materials for the insulation.

B. Exterior Wall

3).All the materials for the structural panels.

4). All the materials for the structural (exterior wall) insulation.

5). All the materials for the exterior (exposed)decorative materials.

C. Interior Wall

6). All the materials for the structure.

7). All the materials for the structural penal.

8).The joint mixture.

D. Floor

9). All the materials for the floor structure.

10). All the materials for the floor insulation.

11).All the materials for the floor panel (or easy concrete floor).

E. Ceiling

12).All the materials for the ceiling structure.

13). All the materials for the ceiling panel.

14). The joint mixture.

F. Kitchen & Washing Room

15).Waterproof layer.

16).Rough cement or cement panel finish.

17).No cupboard, no cooking bench, no sink, no cooking utensils in the kitchen; No shower, no toilet, no basin.

G. Water

18).The pipes are included in the order, but without any taps.

H. Electricity.

19).The electricity pipes are included in the order, but without any wire, switch, socket,lamp and other electric equipments.
The prefab house/ home we offered is rough house actually.